DrBleep's Sandbox Operation HIGH TIDE

You are currently viewing ITERATION IT-001-1. To view the next iteration please click here.

WARNING: ATTEMPTED ACCESS DETECTED. THIS DOCUMENT IS UNDER LEVEL 5 CLASSIFICATION.

USER CODE: HILDALAND

PASSWORD: THE13O5SRIDETHERISINGTIDE

IDENTIFIER ACCPETED.

Welcome back 05-01.

OPERATION HIGH TIDE

The following report contains sensitive details in regards to several SCP-001 contingency operations. Listed assets and personnel may not apply to all contingencies. For security purposes, electronic reports may censor data, or appear incomplete. Questions regarding all documents are to be directed to regional command.

Project Assignment: Seas of Orcadia

Operation Identifier: HIGH TIDE

Threat Level: Maroon.

Priority Designation: PD-001

Dedicated Personnel: NTF-Delta-7 ("Northern Storm"), Finnfolk collective remnants, CTF-Delta-7 ("Spell Slingers"), MTF-Tau-5 ("Samsara"), MTF Omega-12 ("Achilles Heels").

Assets: SCP-3704 (1-4), SCP-████, Modified naval vessels: (2 Iowa class battleships, 13 destroyers, 5 cruisers, 15 support vessels), Finnfolk all terrain and aeronautic vehicles (See SCP-████), 50 M-1 Abrahams tanks, 25 Leopard2a7v.3 tanks, equipped with Finnfolk weapons technology.

Command Personnel: 05-01 subordinates: Dr. Leep Andrews, Dr. Sherry Andrews, Queen Hege Aquailian.

Asset Locations: ███████ Construction Yards , ███████ drydocks, █████ ███████ aquatic depot, Scapa Flow Orkney. All Major SCP-001 sites.

Projected Incident Locations: Ring of Brogdar, Standing Stones of Stenness, Scapa Flow, Skarae Brae, Maeshowe, Loch of Stenness, Ring of Bookan, Bookan, Ustan Tomb, Barnhouse Stone.

Mission Directive: Repair SCP-001 complexes, and subdue breaching E-001 entities. Containment failure constitutes contingency activation, and deployment of all assets to subdue breaching entities.


Background: Operation High Tide is a joint effort between the Foundation and the Collective Remnants of the Finnfolk in response to developments involving SCP-001 over the course of 10 years. Pre-cursor plans for High Tide emerged with the gradual discovery of SCP-3703 instances, and delineation of SCP-001's primary purpose based on historical, mythological, and archaeological evidence accumulated over the course of the past century.

Continuous excavation of Finnfolk artifacts, vehicles, and skeletal remains led Foundation officials to theorize of their existence and relation to SCP-001. These theories were confirmed during the discovery of SCP-3704, following the events of Incident I-3700-032.

The O5 council subsequently enacted an emergency meeting, from which a cooperative-proposal was set forward to the surviving Finnfolk based on severity of recent developments involving SCP-001. Acceptance of this proposal lead to joint command consultations between O5 representatives and surviving members of the Finnfolk leadership. These meetings produced the Primary contingency plan presented below, and additional plans presented in accompanying documentation files.


The following section of this document contains description of the current, active contingency, and brief overview of additional contigencies. Contingencies are listed based on decreasing probability of both Human and Finnfolk survival should the need to enact them arise.

Contingency A: Repair and restoration of SCP-001-01. Surviving Finnfolk engineers and thaumaturges have been deployed to aid Foundation research and containment personnel in restoring functionality and thaumaturgic stability the -01 complex, and perform repairs on SCP-001-02 through -06 as needed. Projected success rates are high.

Status: Ongoing, Active.

Primary target: SCP-001-01. Ancillary attempts on other complexes also underway.

Timetable estimate: Collapse estimated to occur in 22 years, 5 months if repairs not undertaken.


Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License